FAKTOR-FAKTOR YANG MENYEBABKAN KETERLAMBATAN WAKTU PELAKSANAAN PROYEK PADA PEKERJAAN JALAN DAN JEMBATAN DI KABUPATEN MOROWALI

Elce Misba Bansambua (Unknown)



Article Info

Publish Date
05 Dec 2013

Abstract

This research was conducted in Morowali Regent the methodology used in this research was library research to find out the causes of the delay, at the government project implementation such as roads, bridges, dams and buildings at the financial year 2011 using index value calculation analysis. The results show that factors of the delay causes of the roads, bridges, dam and buildings implementation projects were the insufficient of suitable building materials in accordance the needs (D4) with index value 96.67 and the delay mobility resources (materials, instruments, human power) (D1) was with index value 93.33

Copyrights © 2013






Journal Info

Abbrev

maroso

Publisher

Subject

Civil Engineering, Building, Construction & Architecture

Description

Jurnal yang berisikan publikasi hasil penelitian dan kajian dibidang Teknik Sipil serta menggabungkan teori dan praktek dalam ilmu Teknik ...