Jurnal Teknik Industri Terintegrasi (JUTIN)
Vol. 7 No. 4 (2024): October

Preservasi jalan secara long segment ruas jalan Wawotobi – Lasolo

Sakti, Putra (Unknown)
Nasrul , Nasrul (Unknown)



Article Info

Publish Date
15 Oct 2024

Abstract

The implementation of long segment-based contracts which is considered new for service users and large contractors, the implementation of roads. So it is necessary to understand the system. The parties have difficulty implementing the standards that have been determined and understanding the scope of the work being carried out, resulting in the implementation of long segment-based work not being carried out effectively until now. Seeing the above problems, this research was carried out to The method used in this study uses the Importance perpormance analysis (IPA) questionnaire method. In accordance with the limitations of this study, the number of respondents used was 30 service users and 30 service providers at the Southeast Sulawesi Road Implementation CenterThe method used in this study used the Importance perpormance analysis (IPA) questionnaire method. In accordance with the limitations of this study, the number of respondents used was 30 service users and 30 providers Factors of understanding from Officials Commitment Makers (PPK) as service users place understanding in contract law as the dominant factor with weight (0.195), while service providers/contractors place the ability to understand contract law as the dominant factor with weight (0.206).

Copyrights © 2024






Journal Info

Abbrev

jutin

Publisher

Subject

Decision Sciences, Operations Research & Management Energy Engineering Industrial & Manufacturing Engineering Mechanical Engineering

Description

Jurnal Teknik Industri Terintegrasi merupakan jurnal yang dikelola oleh Program Studi Teknik Industri Fakultas Sains dan Teknologi Universitas Pahlawan Tuanku Tambusai yang menjebatani para peneliti untuk mempublikasikan hasil penelitian di bidang ilmu teknik dan teknik industri mencakup proses ...