Serambi Engineering
Vol. 9 No. 4 (2024): Oktober 2024

Audit Energi Sederhana Pada Pompa Distribusi IPA 2 Pramuka PAM Bandarmasih Kota Banjarmasin

Alvin Rahmadiar Alam (Unknown)
Adhi Yuniarto (Unknown)



Article Info

Publish Date
22 Oct 2024

Abstract

In 2022, the energy cost of PT. Air Minum Bandarmasih Kota Banjarmasin will be Rp. 586/m3 while the national average energy cost was Rp. 363.45/m3. In 2023, IPA 2 Pramuka distributed 41,152,457 m3 at an energy cost of Rp. 479.13/m3. A key step in energy management is to conduct regular energy audits. Energy audits are conducted to assess pump efficiency and determine Specific Energy Consumption (SEC), which facilitates technical recommendations for energy management. The first results of the energy audit at the IPA 2 Pramuka distribution unit of PT. Air Minum Bandarmasih revealed a power factor (cos φ) of less than 0.85, which is detrimental to energy efficiency. The pump efficiency was 50-60%, indicating that minor pump adjustments were needed. In addition, the SEC in 2023 was slightly above 0.4 kWh/m3 (about 0.40094 kWh/m3). The proposed improvement measures were the repair of the pump and regular maintenance, as well as the installation of a capacitor bank to improve the energy efficiency of the distribution unit of IPA 2 Pramuka.

Copyrights © 2024






Journal Info

Abbrev

jse

Publisher

Subject

Earth & Planetary Sciences Energy Engineering Environmental Science Industrial & Manufacturing Engineering

Description

The Serambi Engineering journal is published as a medium to distribute information on research results in engineering and science, both carried out by lecturers from the Serambi Mekkah University and other parties. Published research can be in the form of field research or laboratory research as ...