Cerucuk. Prodi S1 T. Sipil.
Vol 8, No 6 (2024): CERUCUK VOL 8 NO. 6 JUNE 2024

PERFORMANCE ANALYSIS OF STREET AHMAD YANI KM 27 DUE TO THE SP. ROAD REHABILITATION WORK PROJECT. LIANG ANGGANG - BTS. TRAINING CITY SECTION 1 BANJARBARU CITY

Khalikinor, M. Ikhsan (Unknown)
Yasruddin, Yasruddin (Unknown)



Article Info

Publish Date
10 Sep 2024

Abstract

In this study, an analysis of the calculation of traffic volume, vehicle speed and side friction that occurred as a result of the Sp. Road Rehabilitation Project was carried out. Liang Anggang - Bts. Pelaihari City Section 1 Banjarbaru City using the 1997 Indonesian Road Capacity Manual (MKJI) method. Traffic volume conditions on Jalan Ahmad Yani Km 27 as a result of the Sp. Road Rehabilitation Project. Liang Anggang - Bts. Pelaihari City Section 1 City of Banjarbaru on Sunday, January 23, 2022 in the direction of Banjarbaru to Liang Anggang for 3007 vehicles/day, while the direction from Liang Anggang to Banjarbaru is 3041 vehicles/day.The traffic capacity for Jalan Ahmad Yani Km 27 which has a population of 258,753 people, with a city size of 0.1 - 0.5. Analysis data for Jalan Ahmad Yani Km 27 as a result of the Sp. Road Rehabilitation Project. Liang Anggang - Bts. Pelaihari City Section 1, Banjarbaru City on Sunday, January 23, 2022 in the direction of Banjarbaru towards Liang Anggang 3007. With MC 73.46%, LV 15.76%, HV 10.31%, and UM 0.47%. while the direction of Liang Anggang is towards Banjarbaru 3041. With MC 73.04 %, LV 15.36%, HV 11.15%, and UM 0.46%.The average speed that occurs on Jalan Ahmad Yani Km 27 due to the Road Rehabilitation Project Sp. Liang Anggang - Bts. Pelaihari City Section 1, Banjarbaru City on Sunday, January 23, 2022, headed from Banjarbaru to Liang Anggang with an average speed of MC 25.45 km/hour, LV 24.12 km/hour, HV 23.47 km/hour. while the direction of Liang Anggang is towards Banjarbaru with an average speed of MC 25.38 km/hour, LV 24.16 km/hour, HV 23.47 km/hour.The traffic density that occurred on Jalan Ahmad Yani Km 27 as a result of the Sp. Road Rehabilitation Project. Liang Anggang - Bts. Pelaihari City Section 1, Banjarbaru City on Sunday, January 23, 2022 in the direction of Banjarbaru towards Liang Anggang with a traffic density of 86.81 vehicles/hour, LV 19.65 vehicles/hour, HV 13.21 vehicles/hour. while the Liang Anggang direction is towards Banjarbaru with a traffic density of MC 87.52 vehicles/hour, LV 19.33 vehicles/hour, HV 14.44 vehicles/hour. Keywords: Capacity, Speed and Density and MKJI 1997

Copyrights © 2024






Journal Info

Abbrev

crc

Publisher

Subject

Civil Engineering, Building, Construction & Architecture

Description

Jurnal internasional bidang teknik sipil seperti : sumberdaya air, struktur bangunan, mekanika tanah, transportasi dan manajemen konstruksi. ...