JER
Vol. 7 No. 2 (2024): September - February

Analysis Of Handling Of Fertilizer Raw Material Stock Delay Using Safety Stock And Reorder Point Methods In Gresik Fertilizer Company

Nisa, Devy Ana Choirun (Unknown)
Aslamiyah, Suaibatul (Unknown)



Article Info

Publish Date
20 Feb 2025

Abstract

This research analyzes the handling of delays in stock of fertilizer raw materials at the Pupuk Gresik Company by applying the safety stock and reorder point methods. The main problem faced by the company is the lack of supply of raw materials due to short arrival times and seasonal demand, which has an impact on smooth production. This research uses a qualitative descriptive approach with observation methods, interviews with the President Director and Head of Operations, as well as analysis of historical data related to the use of raw materials, lead time and delivery delays. The research results show that companies still use manual recording in inventory management, which contributes to low accuracy in stock planning. By implementing the safety stock and reorder point methods, companies can determine the optimal amount of reserve inventory and more effective reorder points to achieve the desired service level (95%). The implementation of this method is expected to reduce the risk of delays in raw materials and increase operational efficiency at the Gresik fertilizer company.

Copyrights © 2024






Journal Info
JER

Abbrev

JER

Publisher

Subject

Humanities Decision Sciences, Operations Research & Management Economics, Econometrics & Finance

Description

Jurnal Economic Resource_(JER) is open access. This journal is published in _ March & September. Journal of Economic Resources|e-ISSN 2620-6196] is a peer-reviewed journal published twice a year (March & September) by the Faculty of Economics and Business, Universitas Muslim Indonesia_UMI. Journal ...