Advance Sustainable Science, Engineering and Technology (ASSET)
Vol. 7 No. 2 (2025): February-April

Analysis of the Effectiveness of Component Maintenance on PT.XYZ Water Pump Machines through the Life Cycle Cost (LCC) Approach

Albany, Zidane (Unknown)
Saifuddin, Joumil Aidil (Unknown)



Article Info

Publish Date
03 Mar 2025

Abstract

Machine maintenance is an important factor in supporting a manufacturing process that is competitive in the market. Therefore, every company must carry out regular machine maintenance to ensure the machine operates optimally. The aim of this research is to identify damage that may occur to the pump engine and analyze pump maintenance costs which include the cost of repairing or replacing components. The method used in this research is the Life Cycle Cost (LCC) method. The research results show that the maintenance interval for each Bearing component is 1044 hours, Shaft 64 hours, Impeller 76 hours, Gasket 91 hours, Rotor 103 hours, and Bearing Housing 110 hours. The optimal total cost usage at the age of 3 years is IDR. 3,129,542,106/year with the optimal number of mechanics, namely 3 people, previously there were 5 people.

Copyrights © 2025






Journal Info

Abbrev

asset

Publisher

Subject

Chemistry Computer Science & IT Control & Systems Engineering Electrical & Electronics Engineering Industrial & Manufacturing Engineering

Description

Advance Sustainable Science, Engineering and Technology (ASSET) is a peer-reviewed open-access international scientific journal dedicated to the latest advancements in sciences, applied sciences and engineering, as well as relating sustainable technology. This journal aims to provide a platform for ...