Jurnal Teknik Industri Terintegrasi (JUTIN)
Vol. 8 No. 2 (2025): April

Setup Time Measurement on Flexo 4 Using The Single-Minute Exchange of Dies (SMED) Method in a Multi-Group Cardboard Production Setting

Riyanti, Popy Dian (Unknown)
Amalia, Amalia (Unknown)



Article Info

Publish Date
10 Apr 2025

Abstract

Long and unstandardized setup times are a major source of inefficiency in the cardboard packaging production process, particularly on the Flexo 4 machine, which requires 1.5 to 2 hours for setup. This study aims to reduce setup time by implementing the SMED (Single-Minute Exchange of Dies) method. Three internal activities—ink retrieval, material preparation, and plate preparation—were converted into external activities, reducing setup time by up to 66.67%. Observations were made on three work groups during shift 1, with average setup times ranging from the longest to the shortest: Group C (33.9 minutes), Group A (32.3 minutes), and Group B (30.05 minutes). ANOVA results show no significant differences between the groups. The longest setup time occurred in Group C, with 7,500 pcs and 4 plates, taking 75 minutes. This was due to the Mounting Plate process and limited operator resources.

Copyrights © 2025






Journal Info

Abbrev

jutin

Publisher

Subject

Decision Sciences, Operations Research & Management Energy Engineering Industrial & Manufacturing Engineering Mechanical Engineering

Description

Jurnal Teknik Industri Terintegrasi merupakan jurnal yang dikelola oleh Program Studi Teknik Industri Fakultas Sains dan Teknologi Universitas Pahlawan Tuanku Tambusai yang menjebatani para peneliti untuk mempublikasikan hasil penelitian di bidang ilmu teknik dan teknik industri mencakup proses ...