PT. BAR is a refractory material manufacturer and a provider of installation and repair services for industrial units such as boilers, furnaces, and dryers. In practice, the company faces problems with project delays that have an impact on operational cost inflation and decreased customer satisfaction. This study aims to identify the causes of project delays and formulate risk mitigation strategies systematically. The method used is the House of Risk (HOR), which consists of two stages of analysis. At the HOR-1 stage, risk event and risk agent identification is carried out, as well as the calculation of the Aggregate Risk Potential (ARP) value to determine the risk agent with the highest priority. Data were processed from 68 projects from October 2024 to March 2025, with the finding that 20 projects experienced delays and 19 projects experienced cost inflation exceeding the RAB. Furthermore, at the HOR-2 stage, five mitigation actions were prepared which were evaluated based on the ratio of effectiveness to the level of difficulty of implementation. The three main recommended mitigation actions are a maximum location survey of H-1, checking documents and equipment, and coordinating with users and vendors. As a form of implementation, a redesign of the project implementation flow was prepared that integrates mitigation actions into the actual work process, both for regular and sudden projects. The results of the study indicate that the designed mitigation can be applied applicatively and has the potential to increase the efficiency of implementation and control the risk of project delays preventively.
Copyrights © 2025