Jurnal Penelitian Enjiniring Fakultas Teknik Unhas
Vol 27 No 1 (2023)

Perbandingan Biaya dan Waktu Pekerjaan Dinding Bata Ringan Rumah Sederhana di Makassar

Gassing, Rifdah Afifah (Unknown)
Hartawam, Hartawan (Unknown)
Imriyanti, Imriyanti (Unknown)



Article Info

Publish Date
25 May 2023

Abstract

Wall material become a fairly important part in a construction project. Wall materials continue to evolve in line with the demands of needs in achieving the most effective and efficient cost, time, quality. For this reason, developers will think about how to carry out projects in a relatively short period of time and optimize costs. Optimizing costs has a basic reference called Analisis Harga Satuan Pekerjaan (AHSP). This reference is still general, where in each place the application will be different. These differences it is felt necessary to compare with what is happening in the curent place. The goals of this study are to reveal the average comparison between real costs and AHSP costs. This research method is a direct observation method on simple housing projects in Makassar. The research conducted is a case study. This sampling technique used the Simple Random Sampling technique for the labor group. Based on the results of the study, the average worker productivity was 3.052 m2/day. Then the analysis of real costs produces an average cost is 0.016% lower than the calculation of the average AHSP cost analysis, so there is no significant difference.

Copyrights © 2023






Journal Info

Abbrev

jpe

Publisher

Subject

Engineering

Description

Jurnal Penelitian Enjiniring (JPE) merupakan media publikasi ilmiah untuk hasil-hasil inovasi terkini dalam bidang kajian dan rekayasa ilmu pengetahuan dan teknologi keteknikan. JPE diterbitkan dalam dua bahasa dunia (bi-lingual), yaitu Bahasa Indonesia dan Bahasa Inggris. Berbagai bidang ilmu yang ...