Perancangan Sistem Manajemen Proyek Menggunakan Critical Path Method (CPM) di PT Adhi Putra Bangun Perkasa

Kania, R (Unknown)
Febriani, Reni (Unknown)
Maharani, Desti (Unknown)
Hendra, Yul (Unknown)
Rakhmat, Edy (Unknown)



Article Info

Publish Date
12 Aug 2025

Abstract

 The reporting process is only through direct conversation, hampering evaluation, as there is no written record.. This research aims to design a management system, especially in project planning, that allows data entry, scheduling, and reporting in real time. The system design method used is the Waterfall Method with visual modelling using the Unified Modeling Language (UML). This system also utilizes the Critical Path Method (CPM) in helping project scheduling. The results of system testing using black box testing show that the output displayed is a web-based project management system that can perform needs planning and project reporting in real time. The conclusion obtained is that with the use of this system, recording project data no longer requires the use of paper, and data can be stored automatically, as well as project reporting that can be accessed in real time to facilitate project evaluation.

Copyrights © 2025






Journal Info

Abbrev

saintek

Publisher

Subject

Computer Science & IT Decision Sciences, Operations Research & Management Library & Information Science Physics

Description

The aim of this journal is to publish quality articles dedicated to all aspects of the latest outstanding developments in the field of informatics engineering. Its scope encompasses the applications of (but are not limited to) : ICT Software Engineering System Design Methodology Data mining and Big ...