Analysis of Fabrication Work Progress Based on Time Duration and Component Weight at PT. DIP Engineering

Oktavia, Rantini Dwi (Unknown)
Hayati, Nahrul (Unknown)



Article Info

Publish Date
23 Sep 2025

Abstract

This study aims to analyze the progress of fabrication work at PT. DIP Engineering based on time parameters and component weight. The research method used is descriptive quantitative by analyzing secondary data of daily production output and inter-stage durations. The results show that peak activity occurred at the end of May, followed by a decline in early June due to design revisions and stage transitions. Duration analysis identified the waiting time from fit-up to welding as the main bottleneck, with an average of 5.42 days (73% of the total 7.42-day cycle). Pearson correlation test showed a strong and significant positive relationship between weight and quantity of item in the welding and visual inspection stages, although the coefficient of determination indicates that other factors such as item complexity also have a major influence. The study concludes that monitoring based on weight and time data provides objective insights for production planning, and optimization efforts should be focused on reducing queues at the welding stage to accelerate the overall production cycle.

Copyrights © 2025






Journal Info

Abbrev

jurnalsintak

Publisher

Subject

Civil Engineering, Building, Construction & Architecture Control & Systems Engineering Decision Sciences, Operations Research & Management Mathematics

Description

Jurnal Sintak merupakan jurnal yang dikelola oleh Program Studi Matematika Institut Teknologi Batam (ITEBA). Jurnal Sintak menjadi sarana dalam menyebarkan pengetahuan terkait teori maupun aplikasinya di bidang matematika, statistika, dan aktuaria yang diterbitkan dua kali setahun (September dan ...