Analisis Pengendalian Waktu dan Biaya pada Proyek Pembangunan Gedung Medik RSU Assakinah Medika Menggunakan Earned Value Analysis

Wijaya, Eric Nora Setya (Unknown)
Triana, Masca Indra (Unknown)



Article Info

Publish Date
02 Oct 2025

Abstract

Earned Value (EV) is a control method to measure the performance of a project from a time aspect in a sustainable manner and make cost estimates required until the project is completed and the project completion time. This method is one of the appropriate methods to be used in analyzing the Assakinah Medika Hospital Medical Building Construction project where the realization of the progress of the ongoing work on the project does not meet the plan, which only reaches 33.077% where the progress of the ongoing work should have reached 41.795% so that the project experiences a deviation of -8.718%.

Copyrights © 2025






Journal Info

Abbrev

jutin

Publisher

Subject

Decision Sciences, Operations Research & Management Energy Engineering Industrial & Manufacturing Engineering Mechanical Engineering

Description

Jurnal Teknik Industri Terintegrasi merupakan jurnal yang dikelola oleh Program Studi Teknik Industri Fakultas Sains dan Teknologi Universitas Pahlawan Tuanku Tambusai yang menjebatani para peneliti untuk mempublikasikan hasil penelitian di bidang ilmu teknik dan teknik industri mencakup proses ...