Analisis percepatan waktu menggunakan metode Crashing pada Proyek CWI-02 ITS Surabaya

Yahya, Fandy Ahmad Amiruddin (Unknown)
Beatrix, Michella (Unknown)



Article Info

Publish Date
13 Jan 2025

Abstract

In the implementation of construction projects, the measure of project success can be seen from the timely completion time at minimal cost without forgetting the quality of the work. This study aims to determine the duration of the project after acceleration and to know the cost after acceleration. This research was conducted on the CWI-02 ITS Surabaya project. According to the results of existing data in the field, the project has a delay of 8.8879%, so the way to overcome the delay is one of them using the Crashing method, with the alternative of adding working hours and adding labor. The results of the calculation by adding working hours for 4 hours obtained the project duration to 291 or 0.01% faster than the total project of 294 days, then there was a change in the total project cost of Rp. 3,622,264,104.66 or 0.0057% greater than the total project cost. While the calculation results with alternative labor additions obtained the project duration to 292 or 0.0068% faster than the total project duration, then there was a change in the total project cost to Rp. 3,600,758,240.47 or 0.03% greater than the total project cost.

Copyrights © 2025






Journal Info

Abbrev

jutin

Publisher

Subject

Decision Sciences, Operations Research & Management Energy Engineering Industrial & Manufacturing Engineering Mechanical Engineering

Description

Jurnal Teknik Industri Terintegrasi merupakan jurnal yang dikelola oleh Program Studi Teknik Industri Fakultas Sains dan Teknologi Universitas Pahlawan Tuanku Tambusai yang menjebatani para peneliti untuk mempublikasikan hasil penelitian di bidang ilmu teknik dan teknik industri mencakup proses ...