Journal of Sustainability Industrial Engineering and Management System
Vol. 1 No. 2 (2023): January - June

Production Scheduling Analysis to Minimize Makespan with Nawaz Enscore Ham Method at Maros Futry Bakery and Cake Shop

Uyun, Dzahratul (Unknown)
Lamatinulu (Unknown)
Hafid, Muhammad Fachri (Unknown)



Article Info

Publish Date
30 Jun 2023

Abstract

This study aims to regulate the production schedule to reduce product makespan caused by increasing demand. This study using the Nawaz Enscore Ham method to minimize makespan on the production schedule at the Maros Futry Bakery and Cake Shop is very relevant and important. The results of this study are obtained from job sequences from the NEH method are J3-J2-J1 with a makespan time of 2.72 hours Based on the analysis and discussion, the conclusion of this study is the sequence of work in the futry bakery and cake shop obtained by the nawaz enscore ham method, namely J3-J2-J1 or on the product bolu mabel – bolu rempah – maros bread obtained during makespan which is 9827.84 seconds or 163.79 minutes or equal to 2.72 hours. So that it can reduce the buildup of demand with an increasingly fast time compared to the company's makespan time, which is 7.18 hours.

Copyrights © 2023






Journal Info

Abbrev

sustainability

Publisher

Subject

Control & Systems Engineering Decision Sciences, Operations Research & Management Engineering Environmental Science Industrial & Manufacturing Engineering Mechanical Engineering

Description

Journal of Sustainability Industrial Engineering and Management System is an interdisciplinary academic journal devoted to the publication of high-quality research and contributions to the industrial engineering and management community. The major focus are: - To collect and disseminate information ...