Journal of Local Architecture and Civil Engineering
Vol. 3 No. 2 (2025): December

Impact of Risk Associated with Procurement Process on Cost Performance of Public Tertiary Education Institution Projects in Ondo State, Nigeria

B., Fagbemi Kayode (Unknown)



Article Info

Publish Date
01 Dec 2025

Abstract

The procurement process remains a critical component in determining the success of construction projects, especially in public institutions. This study evaluates the impact of risks associated with procurement processes on the cost performance of building projects in public tertiary education institutions in Ondo State, Nigeria. Data were gathered from 63 construction projects using structured questionnaires and a pro forma. Analytical tools employed include frequency, mean item score, Paired-Samples T-Test, Shapiro-Wilk Test, Kruskal-Wallis Test, Mann-Whitney U Test, and Cronbach's Alpha. Results revealed a statistically significant difference between initial and final project costs, with major procurement risks identified at the planning, specification, and bid evaluation stages. The study recommends stricter attention to procurement planning and risk assessment to improve cost performance in public building projects.

Copyrights © 2025






Journal Info

Abbrev

localengineering

Publisher

Subject

Arts Humanities Civil Engineering, Building, Construction & Architecture Control & Systems Engineering Electrical & Electronics Engineering Engineering

Description

Local Engineering Journal of Local Architecture and Civil Engineering is dedicated to disseminating scholarly research and practical applications in the fields of architecture and civil engineering with a particular emphasis on local and regional perspectives. Our goal is to foster the exchange of ...