The Effect of the Number of Work Shifts for Erection Box Girder Using Launching Gantry on the Cost and Implementation Time in the Medan-Binjai II Railway Line Project

Mulyati, Ely (Unknown)
Amelia, Dessy (Unknown)



Article Info

Publish Date
28 Nov 2025

Abstract

Resource management strategies in the construction sector play a vital role in achieving cost efficiency and accelerating project execution time. One applicable form of resource management is the implementation of shift work management. In the context of a railway overpass construction project utilizing the erection box girder method with a Launching Gantry and experiencing delays, the configuration of shift schedules becomes a critical variable due to its direct impact on operational costs and project duration. This study was conducted by developing a work schedule for the erection of box girders using Microsoft Project software for two shift work scenarios: a single-shift system and a two-shift system. Subsequent analysis was carried out to evaluate the project duration and calculate the implementation costs for each shift alternative.The analysis results indicate that the implementation of a two-shift work system has a significant impact on time efficiency and cost control. By adopting a two-shift system, the project duration can be accelerated by up to 48 days compared to a single-shift system. In terms of cost, the two-shift system is also able to reduce total project implementation costs by approximately 3.5% compared to the single-shift alternative.

Copyrights © 2025






Journal Info

Abbrev

bjce

Publisher

Subject

Civil Engineering, Building, Construction & Architecture Engineering

Description

Bandar Journal of Civil Engineering has an area of expertise consisting of Structural Engineering, Construction Engineering & Management, Geotechnical Engineering, Water Resources Engineering, Transportation Engineering and Ocean ...