Scientific Contributions Oil and Gas
Vol 25 No 1 (2002)

AN EMPIRICAL APPROACH ON LABOUR COSTS FOR OIL FIELD DEVELOPMENT PLANNING

Herlan Adim (Research and Development Centre for Oil and Gas Technology "LEMIGAS")



Article Info

Publish Date
31 Mar 2022

Abstract

In planning the development of an oil reservoir, the guidelines should be the annual production targets for a five-year period and for the year when development is scheduled to reach its peak. The production targets must be coordinated with the planned development of the oil industry as a whole. The planned oil production targets for the industry as a whole must be apportioned between different oil-bearing areas and different fields within an area. The development plan for each field should ensure the most efficient production, i.e, at the lowest possible cost. The recommended procedure is first to have a wide grid of wells so as to get a better idea of the reservoir and to finalise the spacing of the planned wells.

Copyrights © 2002






Journal Info

Abbrev

SCOG

Publisher

Subject

Chemical Engineering, Chemistry & Bioengineering Energy

Description

The Scientific Contributions for Oil and Gas is the official journal of the Testing Center for Oil and Gas LEMIGAS for the dissemination of information on research activities, technology engineering development and laboratory testing in the oil and gas field. Manuscripts in English are accepted from ...