Journal Serambi Engineering (JSE)
Vol. 11 No. 1 (2026): Januari 2026

Simulasi Antrian Shipping Out pada Gudang Multiguna PT XYZ Untuk Optimalisasi Waktu Tunggu dan Peningkatan Distribusi Menggunakan Software ARENA

Qolbi Rohim, Ahmed (Unknown)
Mega Cattleya PA Islami (Unknown)



Article Info

Publish Date
12 Jan 2026

Abstract

In the shipping out or delivery service to customers, the loading-unloading process in the warehouse is inevitably linked to queuing. This study discusses how to overcome bottleneck issues during the shipping out process in the warehouse. The research was conducted using a simulation method with ARENA software and queuing theory. The validity test using the Welch Confidence Interval method yielded the result [-26.5714 ≤ μ1 – μ2 ≤ 0.6500], which indicates the data is valid because the value 0 lies within the μ1 – μ2 range. Based on the ARENA output, the Process station to TKBM shows a significantly different utilization rate compared to other workstations, at 0.519160466 or 51.91%. Given this significant difference in availability and performance, an improvement was proposed by adding one more worker for loading-unloading activities. This resulted in a new utilization rate of 0.319951 or 31.99%. This improvement proposal can therefore be considered to reduce queue time.

Copyrights © 2026






Journal Info

Abbrev

jse

Publisher

Subject

Earth & Planetary Sciences Electrical & Electronics Engineering Energy Engineering Environmental Science Industrial & Manufacturing Engineering

Description

Jurnal ini bertujuan untuk merancang dan mengembangkan sistem turbin angin sebagai alat pengusir hama burung sekaligus sebagai pembangkit listrik alternatif di area persawahan. Penelitian difokuskan pada pemanfaatan energi angin untuk menggerakkan perangkat mekanik penghasil suara (sebagai pengusir ...