Jurnal Teknik Industri Terintegrasi (JUTIN)
Vol. 8 No. 4 (2025): October

Usulan Perbaikan Tata Letak Raw Material Cable pada Gudang Pusat Menggunakan Metode ABC di PT X

Mulya, Ulwan Adi (Unknown)
Rahmawati, Nur (Unknown)



Article Info

Publish Date
20 Oct 2025

Abstract

The Central Warehouse of PT X serves as a storage facility for raw materials prior to shipment to users or production sites. The vast quantity of production materials necessitates optimal storage space to ensure proper storage. Effective material management and placement significantly impact storage capacity. This study aims to optimize raw material cable layout at the central warehouse using the ABC method. Analysis involves categorizing materials by size and priority, facilitating efficient handling and management. Results show a 17.5% reduction in overall material storage space and significant improvements in spatial efficiency. The proposed layout design enhances operator inspection and mobility while minimizing error and injury risks. This research contributes to developing effective, efficient and sustainable logistics and warehouse management strategies. 

Copyrights © 2025






Journal Info

Abbrev

jutin

Publisher

Subject

Decision Sciences, Operations Research & Management Energy Engineering Industrial & Manufacturing Engineering Mechanical Engineering

Description

Jurnal Teknik Industri Terintegrasi merupakan jurnal yang dikelola oleh Program Studi Teknik Industri Fakultas Sains dan Teknologi Universitas Pahlawan Tuanku Tambusai yang menjebatani para peneliti untuk mempublikasikan hasil penelitian di bidang ilmu teknik dan teknik industri mencakup proses ...