Petrogas : Journal of Energy and Technology
Vol 8, No 1 (2026): MARCH

PERENCANAAN SQUEEZE CEMENTING JOB PADA SUMUR “RF-L”, LAPANGAN “D” DENGAN MENGGUNAKAN METODE BALANCE PLUG

Rombe, Ripal (Unknown)
Afifah, Rohima Sera (Unknown)
Mukmin, Muhammad Nur (Unknown)
Tryana, Aris Luqman (Unknown)
Manik, Nijusiho (Unknown)
Kurniawan, Rizky (Unknown)



Article Info

Publish Date
30 Mar 2026

Abstract

This research aims to design a squeeze squeeze cementing job for well “RF-L” in field “D” using the balance plug method to isolate the MFS-8 formation layer, which has shown a decline in productivity and an increase in water production. The research method using the balance plug technique . The calculations were based on casing, tubing, perforation, and reservoir pressure data. The results indicate that the squeeze cementing operation requires 46 sacks of Class G cement with a total slurry  volume of 9.402 bbl and 5.5 bbl of mixing water. The volume of spacer ahead was 12.81 bbl and spacer behind was 1.09 bbl, while the displacement fluid volume was 4.5 bbl (after subtracting 1 bbl of underdisplacement). Reverse circulation of 5.2 bbl was performed to clean residual slurry  from the tubing. Hesitation and Waiting on Cement (WOC) were applied to ensure the cement hardened properly in the target zone without damaging the formation

Copyrights © 2026






Journal Info

Abbrev

petrogas

Publisher

Subject

Chemical Engineering, Chemistry & Bioengineering Decision Sciences, Operations Research & Management Earth & Planetary Sciences Electrical & Electronics Engineering Energy

Description

PETROGAS: Journal of Energy and Technology covers research articles including: Fossil Energy Renewable Energy Innovation of Technology Technology of Exploration & Exploitation Technology of Industrial Management in Energy ...