Optimization of Sandblasting Project Scheduling at PT. Prima Saka Engineering Using the Hungarian Algorithm

Marena, Jihan Tria Marena (Unknown)
Nurfitria, Nia (Unknown)



Article Info

Publish Date
28 Feb 2026

Abstract

This study employs the Hungarian Algorithm to optimize the sandblasting project scheduling at PT. Prima Saka Engineering. Five workers (P1-P5) with different specializations were assigned five tasks: surface preparation (T1), exterior sandblasting (T2), interior sandblasting (T3), primer application (T4), and final quality inspection (T5). The goal was to reduce overall completion time, with each worker being assigned to only one task. The methodical steps comprised matrix building, reduction, and optimality testing. The Hungarian Algorithm generated an optimal assignment with a minimal total time of 1,128 hours, saving 222 hours (16.4%) compared to the previous 1,350-hour method. This study demonstrates that the Hungarian Algorithm provides a mathematically optimal and practically applicable framework for strategic resource allocation and project management.

Copyrights © 2026






Journal Info

Abbrev

VoJ

Publisher

Subject

Mathematics

Description

Vygotsky: Jurnal Pendidikan Matematika dan Matematika adalah jurnal yang bertujuan untuk mengungkap fakta, masalah, dan pemecahan masalah dalam bidang pendidikan matematika dan ...