Optimalisasi Penggunaan Alat Berat dalam Pekerjaan Timbunan Jalan Tol Patimban Paket 02

Athaya Zhafirah (Institut Teknologi Garut)
Algi Muhaemin (Institut Teknologi Garut)
Rudy Febrijanto (Institut Teknologi Garut)
Madi Hermadi (Institut Teknologi Garut)



Article Info

Publish Date
31 May 2026

Abstract

The Patimban Toll Road Project Package 02 at STA 21+800–23+600 is part of a National Strategic Project (PSN) that requires high efficiency, particularly in large-volume embankment works. This study aims to analyze the productivity of heavy equipment used in embankment operations in order to determine an optimal equipment utilization plan in terms of time and cost. The scientific contribution of this research lies in the development of an approach for planning the number of equipment units based on actual field productivity combined with operational cost analysis, which can serve as a reference for heavy equipment management in large-scale infrastructure projects. The results show that a combination of 6 units of Komatsu PC200 excavators, 38 units of Isuzu dump trucks, 6 units of Zomlion ZD170G bulldozers, 5 units of sheep foot rollers, and 5 units of vibratory rollers is capable of completing an embankment volume of 372,714 m³ within 90 working days, with a total rental cost of IDR 191,644,520 per day.

Copyrights © 2026






Journal Info

Abbrev

konstruksi

Publisher

Subject

Civil Engineering, Building, Construction & Architecture

Description

Jurnal Kosntruksi yang dapat menampung dan mempublikasikan hasil karya penelitian, karya tulis dan pengabdian masyarakat baik mahasiswa dan dosen-dosen intern maupun dari pihak luar. Jurnal Konstruksi memberikan informasi yang diperoleh dari laboratorium dan workshop penelitian maupun dari lapangan/ ...