Jurnal Teknik Industri Terintegrasi (JUTIN)
Vol. 9 No. 3 (2026): July

Perencanaan Kebutuhan Bahan Baku untuk Memenuhi Permintaan pada Produksi Wheeldop

Karisma Dwi Rahayu (Universitas 17 Agustus 1945 Surabaya)
Siti Mundari (Universitas 17 Agustus 1945 Surabaya)



Article Info

Publish Date
04 Jul 2026

Abstract

UD XYZ is a company engaged in the metal industry, with its main product being wheeldops (wheel covers). The main problem faced by the company is the lack of raw material inventory planning for steel plates, resulting in stockouts that disrupt the production process and delay order fulfillment. This study aims to determine the optimal order quantity, appropriate reorder timing, and the required level of safety stock to minimize the risk of stockouts and inventory costs. The methods used in this study are the Continuous Review System (CRS) and the Periodic Review System (PRS). Based on the comparison results, CRS has a lower total inventory cost of Rp 1,712,173,383 compared to PRS. The model was then developed into a Continuous Review System with Backorder by considering a backorder cost of Rp 295,000 per sheet, resulting in an order quantity of 424 sheets, a safety stock of 83 sheets, and a reorder point of 120 sheets. This policy is intended to anticipate the risk of stockouts caused by raw material delivery delays during the lead time. 

Copyrights © 2026






Journal Info

Abbrev

jutin

Publisher

Subject

Decision Sciences, Operations Research & Management Energy Engineering Industrial & Manufacturing Engineering Mechanical Engineering

Description

Jurnal Teknik Industri Terintegrasi merupakan jurnal yang dikelola oleh Program Studi Teknik Industri Fakultas Sains dan Teknologi Universitas Pahlawan Tuanku Tambusai yang menjebatani para peneliti untuk mempublikasikan hasil penelitian di bidang ilmu teknik dan teknik industri mencakup proses ...