Cerucuk. Prodi S1 T. Sipil.
Vol 10, No 6 (2026): CERUCUK VOL. 10 NO. 6 JUNE 2026

ANALYSIS OF PROJECT EFFECTIVENESS COMPARISON WITH AND WITHOUT USING COST BUDGET PLAN AND TIME SCHEDULE USING PRECEDENCE DIAGRAM METHOD SCHEDULING

Muhammad Bahrani (Civil Engineering Study Program, Lambung Mangkurat University)
Endah Widiastuti (Civil Engineering Study Program, Lambung Mangkurat University)
Nada Salsabila (Civil Engineering Study Program, Lambung Mangkurat University)



Article Info

Publish Date
20 Jul 2026

Abstract

Good project planning can minimize delays, high costs, and technical adjustments. However, the Nusa Guest House project in Banjarbaru by CV Senusa Group was carried out without comprehensive planning and without involving a formal planning consultant, relying only on floor plans and workers' experience. This study aims to evaluate the effectiveness of projects with and without planning by analyzing the Budget Plan and schedule using the Precedence Diagramming Method (PDM). The compiled budget shows a cost of Rp 2,918,133,500, while the owner allocated Rp 4,406,000,000, resulting in a difference of Rp 1,487,866,500 (excluding VAT). After adding 12% VAT, the difference becomes Rp 1,666,410,480. The project runs for 564 days, from January 2, 2023 to September 12, 2024, with 85% progress achieved. The study concludes that lack of comprehensive planning increases the risk of inefficiency in cost and time. Keywords: Project Planning, Budget Plan, Time Schedule, PDM

Copyrights © 2026






Journal Info

Abbrev

crc

Publisher

Subject

Civil Engineering, Building, Construction & Architecture

Description

Jurnal internasional bidang teknik sipil seperti : sumberdaya air, struktur bangunan, mekanika tanah, transportasi dan manajemen konstruksi. ...