ANALISIS KINERJA PROYEK SUTT 150 kV TAYAN - SANDAI TERHADAP ASPEK BIAYA DAN WAKTU DENGAN METODE EARNED VALUE

Sahat Josua Siahaan (Institut Teknologi PLN)
Tri Wahyu Adi (Institut Teknologi PLN)



Article Info

Publish Date
11 May 2026

Abstract

In a construction project, the key indicators of success are cost, quality, and time performance. To achieve these targets, proper planning, scheduling, and execution control are essential. The Earned Value concept is one of the integrated control methods used to manage both project cost and schedule effectively. This method is applied to analyze project performance and to forecast project completion by providing performance information at a specific reporting period and generating estimates for the total cost and time required to complete the entire project. This final project presents an analysis using the Earned Value Concept to evaluate the contractor's performance, as well as the cost and time aspects of the 150 kV Tayan – Sandai transmission line construction project. The project experienced delays caused by factors related to manpower, methods, materials, and the environment.

Copyrights © 2026






Journal Info

Abbrev

elektrika

Publisher

Subject

Computer Science & IT Control & Systems Engineering Electrical & Electronics Engineering Industrial & Manufacturing Engineering

Description

Elektrika Borneo (JEB) (p-ISSN 2443-0986 dan e-ISSN 2685-001X) merupakan jurnal saintek yang diterbitkan secara berkala sebanyak dua kali dalam setahun yaitu April dan Oktober oleh Jurusan Teknik Elektro, Fakultas Teknik, Universitas Borneo Tarakan. Fokus dan ruang lingkup jurnal ini adalah ...