Analisis Risiko Kecelakaan Kerja pada Proyek Konstruksi Menggunakan Metode Bowtie (Studi Kasus: Pembangunan Terowongan Joyoboyo Surabaya)

Nelson Elkana Daud Way (UNIVERSITAS DR SOETOMO SURABAYA)
Maulidya Octaviani B (UNIVERSITAS DR SOETOMO SURABAYA)
Wisnu Abiarto N (UNIVERSITAS DR SOETOMO SURABAYA)
Sekar Ayu Kuncaravita (UNIVERSITAS DR SOETOMO SURABAYA)



Article Info

Publish Date
04 Aug 2026

Abstract

In the implementation of construction such as the Joyoboyo Tunnel, there are always risks that can arise in every activity or work on the project. The purpose of this study is to analyze the causes, impacts and responses to the most dominant risks and control methods to reduce the risk of work accidents in the Joyoboyo Tunnel Construction project. Data collection techniques through distributing questionnaires with data analysis techniques through Risk Identification and Assessment and Bowtie. The results of the study stated that the causal factors for the risk of "Land prone to landslides" with a risk value of 25. Then the causal factors for the risk of "Low oxygen levels" with a risk value of 20. For the causal factors for the risk of "Scaffolding has not been installed properly" and the causal factors for the risk of "Falling Material in Excavation" with a risk value of 16 with high risk category

Copyrights © 2025






Journal Info

Abbrev

jats

Publisher

Subject

Civil Engineering, Building, Construction & Architecture

Description

Jurnal Aplikasi Teknik Sipil (JATS) E-ISSN 2579-891X, memuat tulisan tentang aplikasi dibidang Teknik Sipil. Aplikasi ini boleh berasal dari semua cabang ilmu teknik sipil baik itu struktural, geoteknik, manajemen konstruksi, hidrologi, transportasi, dan informatika teknik sipil. Sehingga aplikasi ...