Cost Efficiency of Flying Formwork for Bridge Abutment Construction: A Case Study of Bridge 9

Fela Amelia (Universitas Pendidikan Indonesia)
Elis Siti Hamidah (Universitas Pendidikan Indonesia)
Ahmad Baehaqi (Universitas Pendidikan Indonesia)



Article Info

Publish Date
20 Aug 2026

Abstract

Formwork is a critical temporary structure in reinforced concrete construction because its selection affects material consumption, labor requirements, construction duration, safety, and project cost. Conventional formwork for bridge abutments constructed on soft soil may require additional platform preparation, temporary supports, heavy equipment, and associated labor. This study evaluates the cost efficiency of flying formwork applied to the construction of Bridge 9 in the Patimban Access Toll Road Construction Project Package 1. A quantitative descriptive case-study approach was employed using ten cost-efficiency indicators covering materials, equipment, work processes, labor, productivity, quality, occupational safety, duration, direct cost, and indirect cost. Data were obtained from project documentation, field observations, construction records, and relevant literature. The analysis shows that flying formwork eliminated the need for platform improvement, reduced the use of excavators and vibro rollers, simplified formwork activities, reduced labor requirements, improved repetitive work productivity, and reduced construction duration by 195 hours 52 minutes, equivalent to approximately 24 working days. The method generated direct-cost savings of IDR 56,209,704 and indirect-cost savings of IDR 24,420,000 after accounting for the fabrication cost of the flying-formwork system. All ten indicators were fulfilled, resulting in a 100% fulfillment rate and a classification of very efficient. The findings indicate that flying formwork is a promising alternative for repetitive bridge-abutment construction, particularly under soft-soil conditions.

Copyrights © 2026






Journal Info

Abbrev

jcebt

Publisher

Subject

Civil Engineering, Building, Construction & Architecture

Description

Jurnal JCEBT Program Studi Teknik Sipil merupakan jurnal ilmiah yang diterbitkan berkala setiap 6 bulan, yaitu Maret dan September. Jurnal JCEBT Program Studi Teknik Sipil diterbitkan untuk pertama kalinya pada tahun 2017 dengan membawa misi sebagai salah satu pelopor dalam penerbitan media ...