PERFORMA : Media Ilmiah Teknik Industri
Vol 14, No 2 (2015): PERFORMA Vol. 14 No. 2, September 2015

Analisis Efektivitas Mesin Batching Plant 1 dan Mesin Batching Plant 2 dengan Overall Equipment Effectiveness Pada PT. X

Nia Budi Puspitasari (Program Studi Teknik Industri, Universitas Diponegoro)
Eldinda Sazida Permatasari (Program Studi Teknik Industri, Universitas Diponegoro)



Article Info

Publish Date
01 Sep 2015

Abstract

Overall Equipment Effectiveness (OEE) is one of Total Productive Maintenance (TPM) application program, which aims to determine the effectiveness of a machine. PT. X has 3 machine batching plant where machine 1 and 2 used effectively, from the data historically known that the machines batching plant 1 having a value greater namely 1030 minutes compared to the engine batching plant 2 that have value 240 minutes. This research measures the OEE value of two machines Bactching Plant and then compares the results. The value obtained is 82.71% for machine 1 and 84.83% for machine 2. This research suggests that the performance factor is the biggest problem in the machine OEE values, because the enterprise systems is make to order, the recommended action is to maximize the production capacity of each machine by considering a more accurate production targets in each period.

Copyrights © 2015






Journal Info

Abbrev

performa

Publisher

Subject

Engineering Industrial & Manufacturing Engineering

Description

PERFORMA : Media Ilmiah Teknik Industri merupakan jurnal teknik industri yang menyajikan artikel orisinil pada bidang teknik dan manajemen industri. Tema naskah yang diterbitkan mencakup: Manufacturing System, Operation Research, Product Design and Development, Manufacturing Technology, Work Study, ...