Teknik: Jurnal Teknik Mesin, Elektro dan Ilmu Komputer
Vol. 6 No. 2 (2026): Juli : Jurnal Teknik Mesin, Elektro dan Ilmu Komputer

Evaluasi Ketidakseimbangan Beban R-S-T pada Instalasi Listrik Tiga Fasa Bengkel Teknik Mesin SMKN 2 Tasikmalaya

Ifkar Usrah (Universitas Siliwangi)
Rizki Misbah Hidayat (Universitas Siliwangi)
Akmal Nurul Aziz (Universitas Siliwangi)



Article Info

Publish Date
18 Jul 2026

Abstract

Three-phase electrical installations in educational workshop buildings require balanced load distribution to maintain reliability, efficiency, and operational safety. This study aims to evaluate the R-S-T load imbalance in the three-phase electrical installation of the Mechanical Engineering Workshop at SMKN 2 Tasikmalaya. The research used a descriptive quantitative method based on field observation, load data recording, power factor measurement, and analysis of the single-line diagram. The analyzed loads consisted of TL lamps, LED lamps, and socket outlets connected to 19 distribution lines. The results show that the active power distribution was 4,800 W on phase R, 4,640 W on phase S, and 4,340 W on phase T. The active power imbalance reached 5.52%, while the current imbalance reached 5.97%. The main issue was the unequal distribution of single-phase loads among the three phases. Moving Line 19 from phase R to phase T reduced the active power imbalance to 1.60% and the current imbalance to 1.01%. These findings imply that simple load redistribution can improve the technical condition of low-voltage three-phase installations.

Copyrights © 2026






Journal Info

Abbrev

teknik

Publisher

Subject

Description

Teknik: Jurnal Teknik Mesin, Elektro dan Ilmu Komputer diterbitkan Pusat Riset dan Inovasi Nasional, terbit setahun Tiga kali (Maret, Juli dan November) menerapkan proses peer-review dalam memilih artikel berkualitas berdasarkan penelitian ilmiah dan teoritis. Ruang lingkup Jurnal Teknik meliputi ...