Simulation of Mantuil 09 Bridge Construction Scheduling Due to Delays Using Microsoft Project

Anisah Fakhriani (Banjarmasin State Polytechnic)
Muhammad Humaidi (Banjarmasin State Polytechnic)



Article Info

Publish Date
30 Aug 2025

Abstract

The construction of the Mantuil 09 Bridge in Banjarmasin is a complex project that requires precise time planning to avoid delays. This study uses Microsoft Project to develop the schedule, identify the critical path, and simulate solutions for delays caused by the late delivery of Grade 345 structural steel materials. The results show that the initial project duration was 215 calendar days with 27 critical activities. After simulating the delay, the project duration increased to 221 days, and the number of critical activities decreased to 21. Solutions such as overtime and changes to working hours successfully returned the project duration to 215 days, in line with the original schedule.

Copyrights © 2025






Journal Info

Abbrev

mudima

Publisher

Subject

Civil Engineering, Building, Construction & Architecture Decision Sciences, Operations Research & Management Economics, Econometrics & Finance Industrial & Manufacturing Engineering Social Sciences

Description

Journal Description Jurnal Multidisiplin Madani (MUDIMA) adalah adalah jurnal multidisiplin yang diterbitkan oleh Formosa Publisher. Jurnal Multidisiplin Madani (MUDIMA) terbit setiap bulan (monthly). Jurnal Multidisiplin Madani (MUDIMA)merupakan jurnal peer review, open access, dan ilmiah yang ...