An Integrated Decision Support Framework for Demand Forecasting and Gypsum Inventory Optimization in Cement Manufacturing: -

Diana Khairani Sofyan (Department of Industrial Engineering, Faculty of Engineering, Universitas Malikussaleh, Jl. Medan - B. Aceh, Bukit Indah, Lhokseumawe, Aceh, Indonesia)
A. Amri (Department of Industrial Engineering, Faculty of Engineering, Universitas Malikussaleh, Jl. Medan - B. Aceh, Bukit Indah, Lhokseumawe, Aceh, Indonesia)
Syukriah (Department of Industrial Engineering, Faculty of Engineering, Universitas Malikussaleh, Jl. Medan - B. Aceh, Bukit Indah, Lhokseumawe, Aceh, Indonesia)
Bakhtiar (Department of Industrial Engineering, Faculty of Engineering, Universitas Malikussaleh, Jl. Medan - B. Aceh, Bukit Indah, Lhokseumawe, Aceh, Indonesia)
Yohana Dian Putri (Department of Industrial Engineering, Faculty of Engineering, Universitas Malikussaleh, Jl. Medan - B. Aceh, Bukit Indah, Lhokseumawe, Aceh, Indonesia)
Cut Andyna (Communication Studies Program, Faculty of Social and Political Sciences, Universitas Malikussaleh, Jl. Medan - B. Aceh, Bukit Indah, Lhokseumawe, Aceh, Indonesia)



Article Info

Publish Date
12 Sep 2026

Abstract

This study developed an integrated decision support framework that linked gypsum demand forecasting with the Economic Order Quantity (EOQ) and Periodic Order Quantity (POQ) inventory control methods. Historical gypsum consumption data from PT Lafarge Cement Indonesia for 2023–2024, together with ordering costs, holding costs, and replenishment lead times, were analyzed to develop an inventory planning strategy for 2025. Three forecasting methods quadratic, exponential, and cyclical forecasting were evaluated using Mean Absolute Percentage Error (MAPE), and the model with the lowest MAPE was selected to estimate future gypsum demand. The results showed that the selected cyclical forecasting method predicted an annual gypsum demand of 73,167.64 tons for 2025. Under the existing inventory policy, the total inventory cost was Rp6,475,551.63. The EOQ model yielded an optimal order quantity of 6,233 tons and a total inventory cost of Rp5,297,287.41, representing savings of Rp1,178,264.22, or 18.20%. The POQ model resulted in a replenishment interval of approximately 1.02 months, with a safety stock of 15,712.24 tons and a reorder point of 22,475.05 tons. This approach resulted in a total inventory cost of Rp5,239,614.91. Compared with the existing policy, the POQ model provided estimated savings of Rp1,235,936.72, equivalent to a 19.09% reduction in inventory costs. These findings demonstrated that integrating demand forecasting with EOQ and POQ provided a practical approach to improving gypsum inventory planning, reducing inventory costs, and maintaining material availability in cement manufacturing.

Copyrights © 2026






Journal Info

Abbrev

idwm

Publisher

Subject

Chemical Engineering, Chemistry & Bioengineering Civil Engineering, Building, Construction & Architecture Engineering Environmental Science

Description

The journal is intended to provide a platform for research communities from different disciplines to disseminate, exchange and communicate all aspects of industrial and domestic waste management. The topics of this journal include, but are not limited to: Address waste management policy, education, ...