This study aims to evaluate and formulate Supply Chain Management (SCM) strategies to minimize supply chain disruptions and improve blower product quality at CV. Suwan Fan. The main problems faced are an average product defect rate of 8.6% and 10 material delivery delays resulting in 10 days of production downtime. The method used is quantitative descriptive with a SWOT analysis approach. Primary data were obtained through structured questionnaires distributed to 5 internal respondents using purposive sampling techniques, while secondary data were historical production records. Data analysis was conducted by calculating the IFAS, EFAS Matrices, SWOT Cartesian Diagram, and TOWS Matrix. The results showed a total IFAS Matrix score of 3.01 and EFAS of 2.84. The Cartesian Diagram coordinate points are at position (0.161; 0.010), placing the company in Quadrant I (Growth Strategy). The main recommended strategy is the Strength-Opportunity (SO) strategy, focusing on strengthening cooperation with strategic suppliers and utilizing procurement technology. As a conclusion and managerial implication, this research formulated four Standard Operating Procedures (SOPs) covering material procurement, receiving inspection, storage, and release, along with a proposed one-way production layout to sustainably minimize defects and waiting times.
Copyrights © 2026