Line imbalance and unmet daily targets are major operational constraints in garment production lines. This study at CV. XYZ aims to analyze the root causes of production target failures for the Kemko product in Line 3. Methods reengineering was conducted through Left and Right-Hand Charts (LRHC) mapping and actual Operational Breakdown (OB) development based on a time study. The observation yielded a total actual cycle time of 1,765 seconds and a standard time of 2,118 seconds (20% allowance). Although the sewing operators' actual performance was faster than the company's OB baseline (2,676 seconds), daily targets remained unachieved due to non-technical factors. Motion analysis identified bottlenecks caused by out-of-order fabric serial numbers, sticker placements blocking the stitch line, and high operator idle time.
Copyrights © 2026