Unsignalized intersections may experience declining operational performance as traffic demand increases, resulting in longer vehicle delays, queues, and reduced levels of service. This study aims to evaluate the operational performance of the Mengger unsignalized intersection in Pandeglang Regency using the 2023 Indonesian Road Capacity Guidelines (PKJI) and PTV VISSIM, and to identify the most effective traffic management scenario. A quantitative approach was applied using field survey data consisting of traffic volume, vehicle composition, intersection geometry, vehicle movement, and speed data. The PKJI 2023 method was used to determine intersection capacity, degree of saturation, delay, queue probability, and level of service, while PTV VISSIM was used to simulate existing traffic conditions and three traffic management scenarios: side-friction control, approach widening, and three-phase traffic signal implementation. The PKJI 2023 analysis resulted in an intersection capacity of 3,287 pcu/h, a degree of saturation of 0.815, an average delay of 14.08 s/pcu, and Level of Service B. The PTV VISSIM simulation of the existing condition resulted in an average vehicle delay of 31.05 s/veh, an average queue length of 15.94 m, and Level of Service E. Among the three scenarios, approach widening produced the best performance, reducing average vehicle delay to 7.79 s/veh and average queue length to 0.04 m, with Level of Service B. These results indicate that approach widening is the most effective alternative for improving the operational performance of the study intersection.
Copyrights © 2026