The implementation of construction projects requires effective time control to ensure completion according to the planned schedule. Differences between planned and actual schedules can result in time deviations that affect project completion. This study aims to evaluate the suitability of the implementation schedule of the Banjarbaru City Fire Department Office Development Project by comparing planned and actual schedules, analyzing time deviations for each work item, and determining the project implementation status. A quantitative method was used based on primary and secondary data, including the planned schedule, actual schedule, and project progress. Analysis was conducted by comparing planned and actual work durations, calculating time deviations, and evaluating project progress using the S-Curve. The results showed that weekly time deviations fluctuated between a maximum delay of -2.88% (Week 30) and a maximum acceleration of +4.43% (Week 6). Despite work adjustments caused by a ground elevation discrepancy of 80 cm, effective time control allowed the project to achieve a final cumulative deviation of 0.00%. Overall, the project was completed 100% on schedule within the contractual duration of 210 calendar days. These quantitative findings demonstrate that project schedule control was executed effectively despite mid-project design adjustments.
Copyrights © 2026