Background: Predictive maintenance (PdM) is widely promoted to reduce unexpected equipment failures, yet evidence on how employees perceive its operational consequences remains limited, particularly in Indonesian automotive manufacturing. Objective: This study examined changes in perceived unplanned machine downtime and maintenance response effectiveness, early fault detection, and production continuity following PdM implementation at PT Toyota Motor Manufacturing Indonesia (TMMIN), Karawang Plant 1. Methods: A one-group pretest–posttest quasi-experimental design was used. A purposive sample of 120 employees completed an anonymous 20-item questionnaire (five-point scale) before (September–October 2025) and after (January–February 2026) a transition period. Data were analysed using paired-samples t-tests, Cohen’s d_z, and Wilcoxon signed-rank tests. Results: Internal consistency was good to excellent (α = .84–.92). Perceived unplanned downtime decreased significantly (3.20 → 2.59; d_z = −0.91, p < .001), while maintenance response effectiveness (d_z = 0.56), early fault detection (d_z = 0.87), and production continuity (d_z = 0.92) all improved (all p < .001). All four hypotheses were supported. Conclusions: Employees perceived meaningful improvements across all outcomes after PdM implementation. However, the absence of a control group and reliance on self-reported perceptions limit causal inference.
Copyrights © 2026