The reliability of heavy equipment is an important factor in supporting the productivity of mining contractor companies. PT ABC still faces the problem of low Mean Time Between Stoppages (MTBS) on CAT 777D Off-Highway Truck (OHT) units, with an average MTBS of 37.9 hours compared to the company target of 60 hours, as well as a Schedule Maintenance Ratio (SMR) of 50.2% compared to the target of 80%. This condition indicates a relatively high occurrence of unscheduled breakdowns, which may affect productivity and result in potential production losses of USD 1,653,750 per month. This study aims to identify the factors causing unscheduled breakdowns, determine the priority of causal sub-factors, and develop improvement recommendations to increase MTBS using the Analytical Hierarchy Process (AHP) method. A quantitative approach was employed using data obtained from breakdown reports, MTBS reports, preventive maintenance compliance reports, and scheduled oil sampling data. The AHP hierarchy structure was developed based on three main criteria, namely manpower, maintenance, and operations, along with their respective sub-criteria determined through literature studies. The AHP analysis results indicate the priority order of the factors and sub-factors contributing to unscheduled breakdowns based on their respective importance weights. These priorities were subsequently used as the basis for developing improvement recommendations aimed at reducing unscheduled breakdowns and increasing the MTBS of CAT 777D OHT units. The findings provide an analytical basis for the company to determine maintenance improvement priorities based on the causal factors with the highest priority.
Copyrights © 2026