This study aims to evaluate the management of failure costs by minimizing idle time in Internal Terminal Vehicles (ITV) through the implementation of Planning and Control (PNC) operations at PT Terminal Petikemas Surabaya. Idle time in ITV often leads to excessive fuel consumption, reduced loading and unloading productivity, and increased operational expenses categorized as Cost of Poor Quality (CoPQ). The research employs a descriptive qualitative method with a case study approach, utilizing observation, in-depth interviews, documentation, and secondary data analysis from the terminal's operational system. The findings indicate that the application of PNC significantly reduces idle time, thereby improving fuel efficiency, increasing throughput, and enhancing customer satisfaction. Moreover, this strategy contributes to CoPQ control by lowering both internal and external failure costs. The study provides strategic recommendations for terminal management to optimize PNC Staff training and strengthen operational coordination as part of efforts to improve efficiency and competitiveness.
Copyrights © 2026