Renovation projects face uncertainty because existing building conditions may differ from initial plans, triggering scope changes and interconnected risks. This study aims to analyze risks in the renovation project of State Elementary School (SDN) 14 Simpang Ampek Sungai Pua and identify mitigation responses. A qualitative approach was employed through interviews with planners, supervisors, and lead foremen. Data were analyzed using NVivo 15 through coding, thematic grouping, and visualizations including Project Map, Mind Map, Hierarchy Chart, and Word Frequency Query. The findings identified six themes: schedule, cost, material, technical, and resource risks, and risk mitigation. Schedule-related risk was the dominant theme at 29%. The findings indicate that risks are interrelated and require mitigation through RAB evaluation, material control, local material use, stakeholder coordination, and design adjustments.Keywords: Risk Management; Renovation Project; Construction Risk; NVivo 15; Risk Mitigation
Copyrights © 2026