Consumables management at the Corporate University of PT United Tractors Tbk previously relied on paper forms and separate spreadsheets. This study analyzes process changes, functional acceptance, and model-based time changes through INCorp (Inventory Corpu), a web-based inventory management system. This retrospective case study applies an adaptation of the Process Reengineering Life Cycle, BPMN, Fishbone, User Acceptance Testing (UAT) documentation, and time analysis outputs from Bizagi. The changes include data centralization, integrated recording, digital approval, and report export, while physical inspection is retained. All 91 UAT scenarios comprising 237 steps were recorded as Pass. Under baseline parameters, model-based time reductions reached 44.37% for compliant goods receiving, 36.67% for normal requests, 33.22% for reporting, and 20.18% for stocktaking. Duration parameters are representative values based on observation, so results are sensitive to changes in these parameters. The contribution is a mapping of administrative process virtualization that retains physical controls and tiered approval in a corporate university.
Copyrights © 2026