General Background Excavation and foundation works represent crucial initial stages that guarantee the structural stability of buildings, particularly in school construction projects requiring high levels of safety and long-term durability. Specific Background The construction project of TK Dharma Wanita Kwatu in Mojoanyar District, Mojokerto Regency executed by CV Gapura Agung demands strict compliance with technical specifications and structural drawings. KnowledgeGap Comprehensive technical reviews evaluating excavation dimensions, foundation elevations, reinforcement placement, and concrete quality against architectural specifications remain necessary for educational facility developments. Aims This study aims to review the technical implementation of excavation and foundation works in the school construction project of TK Dharma Wanita Kwatu. Results Field evaluations indicate that excavation dimensions, foundation elevations, and concrete slump test results successfully meet technical standards and structural planning requirements. Novelty The systematic synthesis of direct field observations, structural working drawings, and RKS specification evaluations for school sub-structure implementations. Implications These findings ensure that sub-structure execution fulfills technical, quality, and occupational safety requirements, thereby supporting overall building stability. Key Findings Highlights Excavation dimensions, foundation elevations, and reinforcement installations comply fully with structural working drawings and designs. Concrete quality testing utilizing slump tests successfully satisfies required technical standards and specifications. Effective field supervision successfully addresses local site constraints and soil condition adjustments during execution. Keywords Excavation Works, Foundation, School Construction, Structural Quality, Field Supervision
Copyrights © 2026