FaST : Jurnal Sains dan Teknologi
Vol. 10 No. 2 (2026): NOVEMBER

Rancang Bangun Sistem Otomatisasi Material Requirement Planning Berbasis Reorder Point dan Safety Stock

Priskila Christine Rahayu (Universitas Pelita Harapan)
Florencia Aprilia Yessica (Universitas Pelita Harapan)



Article Info

Publish Date
20 Nov 2026

Abstract

The Material Requirement Planning (MRP) process at one of the plants in a tire manufacturing company is carried out semi-manually using several separate Microsoft Excel files, because the plant cannot yet access the company’s main MRP system. This condition causes slower data processing and increases the risk of input errors. This study aimed to design and developed an automated Material Requirement Planning system based on Macro VBA in Microsoft Excel to support the production material planning process. The system consists of three main modules: Material Incoming System, MRP System, and Dashboard Monitoring, integrated using Power Query and separate databases. Material requirements are derived from the Master Production Schedule and Bill of Materials, and Safety Stock and Reorder Point (ROP), are calculated from a seven-day forward moving average and standard deviation of planned usage (98% service level, one-day lead time). Planned order receipts are generated automatically and rounded up to the supplier’s pack size. System testing was conducted using Black Box Testing, mathematical validation, the System Usability Scale (SUS), and a time study with 15 repeated measurements per activity before and after implementation. All 30 Black Box test scenarios passed. Mathematical validation using material sample B303V over seven projection dates showed that all system calculation results were identical to manual calculations. The mean SUS score from 13 users was 73.5 (SD 5.2; 95% CI 70.3-76.6), which falls into the Good and Acceptable categories. The mean total process time decreased from 28 minutes 49 seconds to 7 minutes 6 seconds, a 75.35% reduction that was statistically significant (Welch’s t-test, p < 0.001). In conclusion, the developed system provides a low-cost spreadsheet-based tool that supports faster and more consistent material requirement decisions for plants not yet integrated with an ERP-based MRP system, although its configuration must be adjusted for other business processes.

Copyrights © 2026






Journal Info

Abbrev

FaSTJST

Publisher

Subject

Computer Science & IT Environmental Science

Description

Started in 2017, FaST publishes articles in the areas of science and technology, particularly in food technology, biology, electrical engineering, industrial engineering, mathematics and civil engineering. Articles are either reviews and/or research ...