The Wining River in Pasarwajo Subdistrict, Buton Regency, has a gross head of 42.7 m from a 2020 Total Station survey, but its power potential had never been calculated with a fully documented method. This study estimated the potential with the Power Duration Curve (PDC) method derived from a Flow Duration Curve (FDC) built from twelve monthly design-discharge values rather than a continuous discharge record. The values were ranked, assigned Weibull exceedance probabilities, and converted to power via P = ρ.g.Q.H.η, with installed capacity set at the Q65 design discharge by linear interpolation. Sensitivity to design dependability, efficiency, head loss, environmental flow and minimum operating discharge was tested in a base-case and a conservative scenario. The base case (gross head, η = 0.80) gave an installed capacity of 1,271 kW, annual energy production of 10.22 GWh and a model-based capacity factor of 91.8%; the conservative scenario gave 779 kW and 6.15 GWh. Design discharges of Q60 to Q80 gave 1,802 to 1,098 kW. A comparative assessment found that two power tables in the survey report differ from each other by about 2.47-fold and from the simulation by more than two orders of magnitude, so the simulation is a reproducible reference, not an independent validation. The capacity (779 to 1,271 kW) lies around the 1 MW boundary between mini-hydro and small-hydro, above the micro-hydro scale, and a Francis turbine is the most suitable type for this head.
Copyrights © 2026