Purpose: This study builds an analytical framework for scheduling Preventive Maintenance (PM) of a repairable system, balancing the cost of unplanned failures against the cost of planned interruptions. Resarch Methodology: The unit is modeled as a four-state continuous-time Markov chain (good, degraded, failed, under PM). Transient behavior follows from the Chapman-Kolmogorov equations, while long-run behavior is obtained through Cesàro and Abel means, which stay well defined under periodic schedules. The PM rate is optimized by golden-section search and checked by Monte Carlo simulation.Results: For an assumed parameter set, the optimal PM rate is 0.0781 per hour (mean interval 12.8 h), cutting the cost rate from 12.50 to 9.35 units per hour (25.2%) relative to run-to-failure, while availability falls from 0.875 to 0.817. Chapman-Kolmogorov residuals are of order 10⁻¹⁵ and simulation matches the analytical cost within 0.5%.Conclusions: Summability gives a rigorous meaning to steady-state criteria, the cost curve is flat near its optimum, and the optimum depends mostly on the two cost rates and the corrective repair rate.Limitations: The model covers a single unit with exponential times, perfect maintenance, and illustrative rather than field data.Contributions: The study links summability theory to maintenance optimization and offers a reproducible, closed-form template with explicit verification steps.
Copyrights © 2026