ILTEK : Jurnal Teknologi
Vol. 21 No. 02 (2026): ILTEK : Jurnal Teknologi

Improving Physical Availability of Komatsu PC2000-8 Using SWOT Analysis and FMEA

Norman Yazid (Swiss German University)
Yunira Umniati (Swiss German University)
Dena Hendriana (Swiss German University)



Article Info

Publish Date
30 Oct 2026

Abstract

Physical Availability (PA) is a critical Key Performance Indicator (KPI) in mining equipment maintenance contracts. At PT ABC Sangkulirang, the PA of Komatsu PC2000-8 excavators declined to 89%, below the contractual target of 92%, threatening productivity and service continuity. This study aims to improve PA through an integrated DMAIC framework, combining SWOT Analysis for organizational factors and Failure Mode and Effect Analysis (FMEA) for technical risks. The results show that corrective actions focused on manpower adequacy, maintenance process discipline, infrastructure support, and critical component redesign successfully increased PA to 94%. This research demonstrates that integrating strategic and technical analysis provides a robust approach for improving heavy equipment availability in mining operations.

Copyrights © 2026