Jurnal Teknik Industri: Jurnal Keilmuan dan Aplikasi Teknik Industri
Vol. 9 No. 2 (2007): DECEMBER 2007

ROBUST-HYBRID GENETIC ALGORITHM FOR A FLOW-SHOP SCHEDULING PROBLEM (A Case Study at PT FSCM Manufacturing Indonesia)

Johan Soewanda (Alumnus, Faculty of Industrial Technology, Petra Christian University)
Tanti Octavia (Faculty of Industrial Technology, Petra Christian University)
Iwan Halim Sahputra (Faculty of Industrial Technology, Petra Christian University)



Article Info

Publish Date
31 Jan 2008

Abstract

This paper discusses the application of Robust Hybrid Genetic Algorithm to solve a flow-shop scheduling problem. The proposed algorithm attempted to reach minimum makespan. PT. FSCM Manufacturing Indonesia Plant 4's case was used as a test case to evaluate the performance of the proposed algorithm. The proposed algorithm was compared to Ant Colony, Genetic-Tabu, Hybrid Genetic Algorithm, and the company's algorithm. We found that Robust Hybrid Genetic produces statistically better result than the company's, but the same as Ant Colony, Genetic-Tabu, and Hybrid Genetic. In addition, Robust Hybrid Genetic Algorithm required less computational time than Hybrid Genetic Algorithm

Copyrights © 2007






Journal Info

Abbrev

ind

Publisher

Subject

Industrial & Manufacturing Engineering

Description

Jurnal Teknik Industri aims to: Promote a comprehensive approach to the application of industrial engineering in industries as well as incorporating viewpoints of different disciplines in industrial engineering. Strengthen academic exchange with other institutions. Encourage scientist, practicing ...