Seminar Nasional Teknologi Informasi Komunikasi dan Industri
2016: SNTIKI 8

Perancangan Ulang Tata Letak Fasilitas Pada Sistem Produksi Flow Shop (Studi Kasus Pt. Xxx Pekanbaru)

Tengku Nurainun (Jurusan Teknik Industri, Fakultas Sains dan Teknologi Universitas Islam Negeri Sultan Syarif Kasim Riau)
Arif Sulistyawan (Jurusan Teknik Industri, Fakultas Sains dan Teknologi Universitas Islam Negeri Sultan Syarif Kasim Riau)



Article Info

Publish Date
09 Nov 2016

Abstract

A production facility design in flow shop production systems without considering the process flow may cause an ineffective production process flow. The complexity increases if the distance among facilities is too far so it decreases the effectiveness and efficiency during the production activities. This research proposed a plant layout design that has considered the production flow. The plant layout design applied u-shape flow pattern. In this proposal layout design the number of machines were added depending on the machine requirements. The distance of material displacement before the improvement was 21.5 meters, while the total distance of the proposed design was 19 meters.Keywords: facility layout, flow shop production process, material flow

Copyrights © 2016






Journal Info

Abbrev

SNTIKI

Publisher

Subject

Computer Science & IT Control & Systems Engineering Electrical & Electronics Engineering Industrial & Manufacturing Engineering Mathematics

Description

SNTIKI adalah Seminar Nasional Teknologi Informasi, Komunikasi dan Industri yang diselenggarakan setiap tahun oleh Fakultas Sains dan Teknologi Universitas Islam Negeri Sultan Syarif Kasim Riau. ISSN 2579 7271 (Print) | ISSN 2579 5406 ...