PROMINE
Vol 3 No 2 (2015): PROMINE

Determination of Initial Lag and Maximum Lag Distance of Semivariogram on Reserves Calculation of Gold Vein

Nur Ali Amri (Mining Engineering Department, Faculty of Mineral and Technology, UPN “Veteran” Yogyakarta)
Abdul Aziz Jemain (School of Mathematical Sciences, Faculty of Science and Technology, University Kebangsaan Malaysia)
Wan Fuad Wan Hassan (Geological Department, University of Malaya, Malaysia.)
Hasywir Thaib Syiri (Mining Engineering Department, Faculty of Mineral and Technology, UPN “Veteran” Yogyakarta)



Article Info

Publish Date
15 Aug 2018

Abstract

The reserves calculation is one of the early stages before the mining operation, which begins with thesamples prediction. Ordinary kriging is a part of the kriging method that works with semivariogramparameters. The calculation of these parameters based on several things, including thedetermination of the lag distance and the fitting model. This paper is based on the determination of themaximum lag distance of 500 and 800 where the lag distance for both, respectively 15, 25 and 35 withWLS and OLS fitting models. The six combinations can be concluded that increasing of maximumlag distance adds to a large of sill and extend the range. OK prediction shows that the largest goldgrade mean (5.032) occurs in the kriging using WLS fitting models, in which the maximum lag distancesemivariogram is 500 and the distance of each lag is 35.

Copyrights © 2015






Journal Info

Abbrev

Publisher

Subject

Earth & Planetary Sciences Engineering Environmental Science

Description

Jurnal ilmiah dengan nama Promine merupakan terbitan berkala ilmiah Jurusan Teknik Pertambangan Universitas Bangka Belitung yang terbit setiap bulan Juni dan Desember dalam setahun yang meliputi bidang Eksplorasi (Geologi dan Geofisika), Geoteknik/Geomekanika, Pengolahan Minerba, Reklamasi, dan ...