JURNAL REKAYASA SISTEM INDUSTRI
Vol 3 No 1 (2017): (Desember 2017)

PENENTUAN BEBAN KERJA DAN JUMLAH TENAGA KERJA OPTIMAL PADA PRODUKSI TAHU

Kiki Roidelindho (Unknown)



Article Info

Publish Date
07 Dec 2017

Abstract

This study aims to understand the standard time, workload and the amount of labor required in a single cycle of manufacturing work to know the production capacity. Work time measurement using Stopwatch Time Study and Work Sampling, adjustment factor using westinghouse method. Elements of work in this study consists of grinding process, boiling process, filtering process, the addition of vinegar, the process of formation and cutting process. From the working elements, the value of cycle time in the process of making tofu in the overall work element is 83.51 minutes, normal time of 95.19 minutes and standard time of 105.66 minutes, with a daily standard output of 3,634 pcs / day. Working load on production process is 0.26 minutes and workforce is 3 workers.

Copyrights © 2017






Journal Info

Abbrev

rsi

Publisher

Subject

Computer Science & IT Economics, Econometrics & Finance Industrial & Manufacturing Engineering Materials Science & Nanotechnology

Description

Jurnal Rekayasa Sistem Industri (JRSI) terbit sebanyak dua kali dalam satu tahun (Mei dan November). Terhitung Mulai edisi Mei 2018 publikasi jurnal ini telah dilakukan versi online (ISSN 2621-1262) yang sebelumnya hanya berupa versi cetak (print) (ISSN 2477-2089). Publikasi ini bertujuan untuk ...