Energi & Kelistrikan
Vol 9 No 1 (2017): Energi & Kelistrikan

ANALISA PEMBANGUNAN SALURAN TRANSMISI 275 kV ANTARA GI KILIRANJAO DAN GI PAYAKUMBUH

Redaksi Tim Jurnal (Unknown)



Article Info

Publish Date
23 Nov 2018

Abstract

Electrical energy is very important role in human life. rapid population growth resulting in increased electricity needs in Indonesia. Based on the current state of power supply capacity of the next few years will not be able to meet the electricity demand in a number of regions in Indonesia. Therefore PLN as a provider of electrical energy as possible to meet those needs. One step is made by planning to build Transmission Line T / L 275 kV substation Kiliranjao - GI Payakumbuh. With the construction of the substation, it is also necessary distribution of electrical energy that is supplying power to a great everincreasing burden on the city through the transmission line (SUTET) 275 kV. In this study will discuss the environmental feasibility study of development of the transmission line T / L 275 kV Kiliranjao - Payakumbuh and substation. Environmental feasibility study is to obtain accurate information in anticipation of environmental problems that arise and will occur as a result of the construction of the transmission T / L 275 kV, which is useful for various parties, such as PT. PLN as the initiator, the Local Government and Communities.

Copyrights © 2017






Journal Info

Abbrev

energi

Publisher

Subject

Computer Science & IT Control & Systems Engineering Electrical & Electronics Engineering Energy Engineering

Description

ENERGI & KELISTRIKAN Journal, especially to the Electrical Engineering Lecturer and generally to all Practitioners to be able to contribute in the form of scientific writing which will be useful for the application of science and technology, especially in the field of Electrical and Electrical ...